Project Description

The project is to be build on the existing site of the Church, which was destroyed by the EF5 tornado that hit Joplin, MO on May of 2011. The  project includes removal of all masonry foundation walls down to the existing footing and to replace these walls with poured concrete. Re-routed of all underground utilities; and build the new structure as requiered for the new design. Modified the existing parking lot paving to add new plant beds and a new topcoat of asphalt paving.  The south curb cut to Connecticut Avenue will be widened to accommodate two-way traffic.

Project Role

General Contractor, Construction

Project Attributes

Rebuilding Joplin, Missouri.
Construction of a new building for
“First Churchw of Christ, Scientist”